Capacities
Earl’s steel and concrete 799 ft Piers were designed and constructed using the latest state-of-the-art methods, and are outfitted with all the permanent services necessary for mooring and berthing operations. Augmenting Earl’s pier facilities are nearly 50,000 sq. ft. of modern, covered, environmentally-controlled shops and storage areas. Each shop is fully outfitted with all equipment and tooling appropriate to the requirements of the trade.
Pier Number 1 | Pier Number 2 | Wharf | |
---|---|---|---|
Size | 799 ft long x 55 ft wide | 799 ft long x 48 ft wide | 207 ft long x 68.5 ft wide |
Water Depth | 1A &1B: 36+ ft @ Mean Low Lower Water | Berth 2A: 31+ ft and Berth 2B: 30+ ft @ Mean Low Lower Water | 17+ ft @ Mean Low Lower Water |
Capacity | Lateral Load @ 3,135.6 kips | Lateral Load @ 1,625.7 kips plus 3ea 300-ton dolphins | |
Electric Power |
12,000 amps at 450 volts 3 phase ungrounded power for ship power
2,500 amps at 450 volts 3 phase grounded power for pier services |
5,000 amps, 450 volts, 3 phase | 1,200 amps, 450 volts, 3 phase |
Steam | 24,200lbs / hour @ 150 PSIG | 12,000 lbs / hour @ 150 PSIG | |
Potable Water | 288,000 GPD @ 80 PSIG | 288,000 GPD @ 80 PSIG | 144,000 GPD @ 80 PSIG |
Fire Main | 2,900 GPM @ 150 PSIG | 1,000 GPM @ 150 PSIG | |
Feed Water | Unlimited (by contract) | Unlimited (by contract) | Unlimited (by contract) |
Compressed Air | 1,500 CFM @ 125 PSIG | 1,500 CFM @ 125 PSIG | |
Sewage Disposal | 6″ Sanitary Main to City Main @ 544,000 GPD | 6″ Sanitary Main to City Main @ 544,000 GPD | 6″ Sanitary Main to City Main @ 544,000 GPD |
Phone Lines | 30 Direct Trunk Lines (15 each side of pier) | 30 Direct Trunk Lines (15 each side of pier) | 15 Direct Trunk Lines |
Fiber Optics | Direct Connection Available Each Side of Pier | Direct Connection Available Each Side of Pier | Direct Connection Available |
Fire Alarm | Permanent Fire Alarm each side of Pier | Permanent Fire Alarm each side of Pier | Permanent Fire Alarm System |
Flooding Alarm | Permanent Flooding Alarm each side of Pier | Permanent Flooding Alarm each side of Pier | Permanent Flooding Alarm System |
Security | Controlled Access by Facility Security Service | Controlled Access by Facility Security Service | Controlled Access by Facility Security Service |